Frauscher Sensor Technology has completed the divestiture to Wabtec Corporation.

Find Out More
Axle Counter Overlay System | UK
Train DetectionUnited Kingdom of Great Britain and Northern Ireland

Axle Counter Overlay System

Operator
Network Rail
Country
United Kingdom of Great Britain and Northern Ireland
Partner
Siemens
Segment
Main & Regional Line
Application
Track Vacancy Detection
Products
FAdC®, RSR123
Year
2019
Scope of project
45 counting heads, 4 FAdC® location cases

Between London St Pancras International Station and Farringdon Station, there is a history of frequent flooding through the tunnels that adversely affected the reliability of the existing train detection system. Due to this, the installation was non-operational during large periods. However, being a mainline section and a core route through London, high reciliation to any sort of failures is vital.

In 2019, Network Rail started to look at how to improve the overall reliability of the railway without removing the existing detection system. The main requirement was guaranteeing maximum availability considering the local conditions without interfering with the existing installation.

Due to its great reliability under such circumstances the Frauscher Advanced Counter FAdC® has been chosen as the most appropriate solution. The FAdC’s® modular design allowed for the establishment of a decentralised architecture, where four external location cases were installed between the two stations to host the axle counter’s indoor equipment. The system is supported by the Frauscher Wheel Sensor RSR123, which precisely tracks every train axle. The sensor is extremely resilient to water penetration and other environmental and external influences. Thanks to the IP68 rated housing, it even works reliably in case of floods.

Excellent match of requirements

The FAdC® units installed in location cases between the stations can communicate with one another via a vital Ethernet interface and also with the higher-ranking system using relay outputs. With overlay systems, the new track sections had to match the existing track section limits. Therefore, the system had a specific requirement to install the RSR123 within 0.5 m of the existing train detection system and within proximity of the neutral section to avoid any impact on the signalling controls.

Great resilience

The RSR123 is highly resilient against any interference or environmental influences.

Similar Projects
This might also interest you
1/5
Train DetectionIndia

Increasing Availability at Adra Yard

Adra Yard belongs to the Southeastern Railway Zone of Indian Railways and is in West Bengal. Initially the yard was equipped with track circuits and there was a requirement to get them replaced with the Frauscher Advanced Counter FAdC®. This project is one of Frauscher’s esteemed Indian Railway Projects with a coverage of 139 counting heads and 97 track sections.
Train DetectionIndia

Jhansi - Bina Railway Line

The Jhansi-Bina railway line is a strategically important line which belongs to North Central Railway and is in Uttar Pradesh. Initially, the line featured analogue axle counters for detecting trains in individual track sections as well as a DC track circuit train detection system in less congested areas.
Train DetectionFrance

Extension Line D Tram Bordeaux

The Bordeaux tramway was the first French tram system equipped with a Frauscher axle counting system, benefitting from the innovative management methods like Counting Head Control.
Train DetectionIndia

Vijayawada – Gannavaram Rail Line

The Vijayawada – Gannavaram rail line belongs to South Central Railway and is situated in Andhra Pradesh. Initially, the line featured a conventional signalling system and there was a requirement by the operator to update this into an automatic signalling system with the Frauscher Advanced Counter FAdC®.
Train DetectionAustria

GKB Graz-Köflacher Bahn

The operator of the Graz-Köflacher Bahn has made substantial modernisations to the network, choosing a decentralised system architecture and the EULYNX standardised interface. In this case, it was crucial that the new system would ensure a seamless transition from the previous parallel interface for relay systems to EULYNX.