Frauscher Sensor Technology has completed the divestiture to Wabtec Corporation.

Find Out More
Cutting delays through data-driven maintenance
Train Detection, ServicesUnited Kingdom of Great Britain and Northern Ireland

Cutting delays through data-driven maintenance

Operator
Network Rail
Country
United Kingdom of Great Britain and Northern Ireland
Segment
Main & Regional Line
Application
Track Vacancy Detection
Products
FAdC®, RSR123, Frauscher Insights
Year
2023
Scope of project
Frauscher Insights Diagnostics

Frauscher has supported the Paddington project with the adoption of Frauscher Insights Diagnostics, a cloud-based monitoring solution that increases data usefulness and availability. By providing faster fault analysis and health messages, Frauscher Insights has helped Network Rail improve reliability, reduce downtime and delay minutes by up to 80%, and shift towards a proactive maintenance approach.

As one of the busiest and most operationally critical rail corridors in the United Kingdom, the Paddington route experienced increasing infrastructure-related issues that were impacting reliability, performance, and operational costs. As part of Project Brunel, Network Rail sought a digital solution to improve fault response times, enhance data availability, and reduce service disruption without altering the existing safety-critical axle counting system. 

To meet these objectives, Network Rail partnered with Frauscher UK & IE team to deploy Frauscher Insights Diagnostics, a secure, cloud-based monitoring solution that extends the diagnostic capabilities of the Frauscher Advanced Counter FAdC®. The solution was trialled from August 2023 at London Paddington station before being rolled out across twelve locations along the 13-mile section between Paddington and West Drayton, covering more than 750 wheel sensors installed across multiple relocatable equipment buildings. 

Frauscher Insights Diagnostics provides real-time fault notifications, detailed error descriptions, recommended corrective actions, and precise asset location data through a single intuitive interface. Instant alerts ensure maintenance teams are informed without delay, while health and pre-fault monitoring identifies emerging issues before they escalate into failures. Throughout the trial period, user feedback was incorporated into platform enhancements, and close collaboration with Network Rail’s cybersecurity teams enabled nationwide approval and full product acceptance in December 2024. 

By enabling faster fault analysis, improved asset awareness, and proactive maintenance, Frauscher Insights Diagnostics has significantly reduced downtime and delay minutes on the Paddington route by up to 80% for major fault events. The solution has also improved collaboration across more than 60 users and supported a shift from reactive fault response to data-driven maintenance, delivering measurable reliability improvements on one of the UK’s most demanding mainline routes. 

Proactive Maintenance Capability

Frauscher Insights Diagnostics provides system health and pre-fault monitoring, giving maintainers early warning before issues escalate into failures.

Faster Fault Analysis

When a failure occurs, maintainers now have direct access to asset identity and diagnostic data, helping them rectify failures much more quickly - reducing downtime and delay minutes by up to 80% for major fault events.

Fault and Asset Awareness

Fault investigation and reporting is improved and trends in performance are easy to identify.

Similar Projects
This might also interest you
1/5
Train DetectionIndia

Jhansi - Bina Railway Line

The Jhansi-Bina railway line is a strategically important line which belongs to North Central Railway and is in Uttar Pradesh. Initially, the line featured analogue axle counters for detecting trains in individual track sections as well as a DC track circuit train detection system in less congested areas.
Train DetectionIndia

Western Dedicated Freight Corridor (Rewari – Makarpura)

The Western Dedicated Freight Corridor (WDFC) represents one of the most strategically significant freight transportation projects in India. By facilitating the seamless transport of goods between major economic hubs, the intention is that the WDFC will significantly boost economic growth and development in the local region and beyond, further underlying the importance of this project.
Train DetectionFrance

Homologation for the Île-de-France tramway network

The network of Île-de-France tramways in the region of Paris has been a showcase model of public transport since the line T1 opened in 1992. Over a million passengers use these trams daily and today, the system consists of 11 lines covering over 100 kilometres of track. Over the next years it is planned to expand this network even further. For track vacancy detection, the Frauscher axle counting system is considered as being the ideal solution for this comprehensive network.
Train DetectionUnited States of America

Reducing Delays in a Metro (subway) Environment

A large metro operator was researching ways to reduce bottlenecks that were causing significant delays at a busy station. With two routes dividing in close proximity to the station and a complex auto-routing system that required the use of a 30-second timer to release switches, trains would frequently back up when approaching the station.
ServicesAustria

Salzburger Lokalbahn

Frauscher supported the Salzburger Lokalbahn, a regional railway in Austria, with a service assignment that included both the maintenance of Frauscher wheel sensors and axle counters as well as hands-on training for the installation personnel. The customer benefited from efficient troubleshooting and tailored training delivered directly on their own equipment.