When MERMEC set out to install a laser-based Wheel Profile Measurement System in close proximity to the Eurotunnel, they faced a critical challenge: how to avoid unintended laser exposure without compromising the system’s ability to inspect up to 200 trains per day. To meet these requirements, MERMEC partnered with Frauscher.

In 2025, MERMEC commissioned the installation of a high-speed, laser-based Wheel Profile Measurement System for trains entering the Eurotunnel, capable of scanning up to 150 axles per train across nearly 200 trains per day at speeds up to 100 km/h. The constrained track layout left no room for protective barriers, creating a critical safety risk of unintended laser exposure to passengers and nearby trains.

To address this challenge, MERMEC partnered with Frauscher, utilising their Frauscher Advanced Counter FAdC® and Wheel Sensors RSR123. Frauscher developed a fully integrated, fail-safe solution that directly interfaces with MERMEC’s laser system. The system dynamically activates and deactivates laser emissions in real time based on train presence, monitored through two critical track sections. Relay outputs are configured to default to a safe state in the event of power loss or faults, ensuring maximum protection.

Delivered as a pre-configured, tested cubical, the solution simplified deployment and minimised on-site installation effort. Frauscher provided full support during commissioning and handover, enabling seamless integration. By combining precise axle counting with automated laser control, the project achieved a fully safety-certified, future-ready setup that eliminates manual intervention and mitigates the risk of accidental exposure, ensuring reliable, high-speed wheel inspections in a busy mainline environment.

Partnering with Frauscher on the prestigious Eurotunnel project highlights the power of combining complementary strengths. By bringing our advanced expertise and innovation capabilities together with Frauscher’s renowned know-how, we created a synergy that enabled us to tackle complex challenges and deliver exceptional results.
Enrico Betterle

MERMEC

Dual-track monitoring

The FAdC® monitors both adjacent track sections in parallel, enabling precise control of laser triggering based on real-time train detection.

Fail-safe safety logic

Relay outputs are designed to default to a safe state during outages, preventing unintended laser operation.

Turnkey system integration

Solution was delivered in a pre-configured cubical, being fully tested and ready for deployment, with installation support included.

Dynamic control for live environments

The intelligent interface ensures that laser systems only activate when safe to do so which is crucial in busy mainline applications.

Future-ready platform

The flexible internal logic of the FAdC® allows the system to be customised according to operator´s needs, offering a flexible and reliable solution.

Similar Projects
This might also interest you
1/5
Train DetectionIndia

Western Dedicated Freight Corridor (Rewari – Makarpura)

The Western Dedicated Freight Corridor (WDFC) represents one of the most strategically significant freight transportation projects in India. By facilitating the seamless transport of goods between major economic hubs, the intention is that the WDFC will significantly boost economic growth and development in the local region and beyond, further underlying the importance of this project.
Train DetectionUnited States of America

Tracking Trains in Houston

Houston MetroRail (METRO for short) is comprised of three light-rail lines covering 22 miles. Two-car, low-floor trainsets are powered by overhead catenary and operated on a mix of rail types, including embedded, grooved, concrete, and ballasted track. Harsh weather conditions such as extreme heat, humidity, and storms with heavy rains causing floods are typical for Houston. Combined with the variable track structure this caused significant malfunctions of the wheel sensors of METRO’s signalling system.
Data TransmissionUnited Kingdom of Great Britain and Northern Ireland

Headbolt Lane to Rainford Project

As part of the project to expand Merseyrail services, the operator needed to address the challenge of transmitting indication information over a specific section, spanning from Headbolt Lane to Rainford. In this instance, Frauscher’s technology was utilised to fulfill the data transmission requirements of this project, avoiding expensive and time consuming cabling that would have otherwise been required.
Train DetectionUnited States of America

Charlotte Area Transit System (CATS) Supplementing Audio Frequency Track Circuits with Axle Counters

At the Charlotte Area Transit System, frequent false red signal overruns resulted when electromagnetic interference caused “bobbing” of the line’s audio frequency track circuits. The Frauscher Advanced Counter FAdC® was subsequently considered as an alternative to these track circuits to eliminate the occurrence of false red signal overruns.
Train DetectionCanada

Edmonton Metro Line

The Edmonton Metro Line was experiencing significant issues with its newly installed Communications Based Train Control (CBTC) signalling system, which did not perform to the operator‘s expectations. The city was forced to run an incomplete schedule with reduced train speed and frequency which negatively affected commuters and the city of Edmonton in general. Finally in 2019, the operator decided to install a new system in cooperation with Frauscher.