Scope of project
FAdC® with Data Transmission functionality, Wheel Sensor RSR180 and FDS

The Vijayawada Division of Indian Railways introduced a new train detection system with data transmission functionality to overcome the challenges of the existing BPAC and conventional quad cable-based systems. Frauscher implemented the Frauscher Advanced Counter FAdC®, featuring full redundancy, advanced reset mechanisms and remote diagnostics. This upgrade delivers significant cost savings and enhanced system availability for the operator.

The Vijayawada Division Intermediate Block Section projects aimed to upgrade and transform the division with a modern signalling system. Using Frauscher Advanced Counter FAdC®, with data transmission functionality, the division was able to improve reliability and efficiency.

The project covered 24 intermediate block sections over approximately 264 kilometres and 360 detection points.

The SIL 4-compliant, FAdC® was chosen for this project due its benefits in solving the challenges faced by the customer. The solution integrates advanced features such as dual detection, full redundancy, Supervisor Track Section (STS) auto-reset, and Counting Head Control (CHC), ensuring high availability and safety. The data transmission functionality also enabled secure transmission of both vital (track vacancy, signal control) and non-vital (signal status, alarm) information via a dual-path network using optical fiber and redundant quad cables.

Pre-wired cubicles and easy installation of RSR180 ensured minimal on-site disruption. Furthermore, the Frauscher Diagnostic System (FDS) was integrated with Indian Railway’s RailNet network, which allowed real-time web-based remote monitoring.

This upgrade project not only reduced operational costs and maintenance needs but also created a future-ready, modular infrastructure capable of supporting ongoing digital transformation in Indian Railways.

Dual detection with full redundancy

Fully redundant setup with a relay interface (IO-EXB), ensuring fail-safe train detection.

Data transmission

Uninterrupted data flow of both vital and non-vital information.

Remote diagnostics and monitoring

Real-time remote diagnostics, enabling proactive maintenance and rapid issue solving.

Reduced maintenance

Reduced maintenance requirements throughout the system’s lifecycle.

Similar Projects
This might also interest you
1/5
train-detectionCanada

Edmonton Metro Line | Canada

The Edmonton Metro Line was experiencing significant issues with its newly installed Communications Based Train Control (CBTC) signalling system, which did not perform to the operator‘s expectations. The city was forced to run an incomplete schedule with reduced train speed and frequency which negatively affected commuters and the city of Edmonton in general. Finally in 2019, the operator decided to install a new system in cooperation with Frauscher.
train-detectionIndia

Western Dedicated Freight Corridor (Rewari – Makarpura) | India

The Western Dedicated Freight Corridor (WDFC) represents one of the most strategically significant freight transportation projects in India. By facilitating the seamless transport of goods between major economic hubs, the intention is that the WDFC will significantly boost economic growth and development in the local region and beyond, further underlying the importance of this project.
servicesAustria

Salzburger Lokalbahn | Austria

Frauscher supported the Salzburger Lokalbahn, a regional railway in Austria, with a service assignment that included both the maintenance of Frauscher wheel sensors and axle counters as well as hands-on training for the installation personnel. The customer benefited from efficient troubleshooting and tailored training delivered directly on their own equipment.
train-detectionIndia

Increasing Availability at Adra Yard | India

Adra Yard belongs to the Southeastern Railway Zone of Indian Railways and is in West Bengal. Initially the yard was equipped with track circuits and there was a requirement to get them replaced with the Frauscher Advanced Counter FAdC®. This project is one of Frauscher’s esteemed Indian Railway Projects with a coverage of 139 counting heads and 97 track sections.
train-detection

Maintaining the past, creating the future | UK

The Dean Forest Railway (DFR) operates a historical 7 km passenger service line running north from Lydney Junction to Parkend, in the Forest of Dean. Due to extensions of the line and an additional turnout being added at Parkend, an update and modernisation of the existing train detection and signalling system was necessary. Being a heritage railway, it requires high standards in terms of signalling and safety, whilst maintaining the historical touch of the line.