Shalun Signaling | Taiwan
Train DetectionTaiwan

Shalun Signaling

Operator
TRA Taiwan Railway Administration
Country
Taiwan
Segment
Main & Regional Line
Application
Track Vacancy Detection
Products
RSR180, ACS2000
Year
2009

The Shalun Line is frequented by four-car-trains and located in the south of Taiwan. Tropical conditions with temperatures between 22 and 28 degrees and high humidity are not the only challenge the Frauscher Axle Counter Solution has to deal with.

Taiwanese Railway Administration TRA is running the Shalun Line between the stations of Shalun, Chang Jung Christian University and ZhongZhou. It is located in the South of Taiwan, with challenging environmental conditions like high humidity and possible occurrences of floods, among others.

In 2009, the TRA decided to install a Frauscher Axle Counter Solution, based on the Frauscher Axle Counting System ACS2000 and Wheel Sensor RSR180, which has demonstrated maximum reliability and availability under the local requirements without a single malfunction to this day. The RSR180 handles floods and humidity with ease, as it is fully sealed according to IP68.

The robust wheel sensors are easily and quickly mounted without drilling the rail using the Frauscher rail claws. Within the established centralised architecture, no electronics had to be installed at track side, but in housings and cubicles at stations and depots, where they are protected from environmental influences.

Based on the satisfying results that have been achieved by installing this system, Frauscher successfully delivered more than 1800 detection points with the RSR180 and the ACS2000 over the years as they are 100% compliant with the TRA axle counting specifications.

Robust trackside equipment

Frauscher trackside equipment is developed to withstand harsh environments and functions entirely without any trackside electronics.

Easy mounting

The flexibility and modularity of Frauscher’s system enabled an individual, centralised design. By using the Frauscher rail claws the wheel sensors could be easily and quickly mounted without drilling the rail.

Similar Projects
This might also interest you
1/5
Train DetectionChina

Tram Huangpu Line 1

Tram Huangpu Line 1 (HP1) line is located in urban areas with high traffic density and passenger volume as well as many level crossings. The adverse weather conditions can cause flooding of the track bed and add to the challenges for reliable system availability and operations.
Train DetectionCanada

City of Calgary Grade Crossing Upgrade

The City of Calgary in Alberta, Canada was seeking an upgrade to the existing signaling system at a crossing near a station in the downtown area, to alleviate shunt issues caused by winter conditions. The Frauscher Advanced Counter FAdC and Wheel Sensors RSR180 were chosen to augment the existing system. During the eleven month trial period, the axle counter ran in shadow mode with the legacy system to gauge performance and compatibility. After the axle counter was proven during the trial with no faults or errors, the city was able to implement a hybrid crossing design using both the axle counting system and track circuits.
ServicesAustria

Salzburger Lokalbahn

Frauscher supported the Salzburger Lokalbahn, a regional railway in Austria, with a service assignment that included both the maintenance of Frauscher wheel sensors and axle counters as well as hands-on training for the installation personnel. The customer benefited from efficient troubleshooting and tailored training delivered directly on their own equipment.
Train DetectionUnited States of America

MTA Baltimore North Avenue Yard

In this project, reliable and precise train detection was needed to automate the yard and significantly increase efficiency and safety. To meet these requirements, the Frauscher Advanced Counter FAdCi and Wheel Sensors RSR180 were selected for this automation project.
Train DetectionFrance

Homologation for the Île-de-France tramway network

The network of Île-de-France tramways in the region of Paris has been a showcase model of public transport since the line T1 opened in 1992. Over a million passengers use these trams daily and today, the system consists of 11 lines covering over 100 kilometres of track. Over the next years it is planned to expand this network even further. For track vacancy detection, the Frauscher axle counting system is considered as being the ideal solution for this comprehensive network.