Scope of project
Maintenance, Training

Frauscher supported the Salzburger Lokalbahn, a regional railway in Austria, with a service assignment that included both the maintenance of Frauscher wheel sensors and axle counters as well as hands-on training for the installation personnel. The customer benefited from efficient troubleshooting and tailored training delivered directly on their own equipment.

Frauscher supported SLV with a targeted service assignment focused on maintaining Frauscher solutions, including wheel sensors and axle counters, and providing practical training for the maintenance staff. This project addressed both technical issues and knowledge gaps caused by staff turnover and the long operational life of the existing equipment—some of which, like the Wheel Sensor RSR180, had been in use for up to 30 years.

The project centered on the Bergheim line, where intermittent faults prompted SLV to request expert assistance. Over three days, Frauscher’s team conducted comprehensive inspections and adjustments of both trackside and indoor components, including replacements and diagnostic checks. All findings were documented and handed over in a detailed report.

Training was delivered both in the field and in a dedicated classroom session, tailored to the operators requirements and systems in use. This practical approach enabled staff to immediately apply the knowledge using their own equipment, ensuring fast and efficient learning process. Furthermore, the participants also received a certificate of completion to confirm that they have undertaken the required training.

The service was further enhanced by the use of the Frauscher Insights Motion application, a digital tool that streamlined the entire maintenance process with checklists and GPS-based data logging. With these measures, the customer now benefits from improved system reliability, increased in-house expertise, and digital documentation for future maintenance.

Targeted maintenance, hands-on training, and digital tools helped SLV overcome current challenges and boost long-term efficiency:

Efficient Troubleshooting

Axle counters and sensors were inspected and corrected during maintenance. Sensor adjustments resolved recurring issues, ensuring uninterrupted service and correct system installation.

Maintenance without Downtime

Thanks to EULYNX, the different lifecycles of interlocking components are decoupled, meaning they can be replaced independently of the manufacturer.

Practice-Oriented Training

Staff were trained through fieldwork and tailored theory sessions, using the operator’s own equipment. This hands-on approach ensures fast and efficient transfer of knowledge.

Comprehensive Documentation

A full report with component status and actions was provided. Operators using the Motion application also gain access to GPS data for future reference.

Similar Projects
This might also interest you
1/5
train-detectionChina

Chengdu Tram Line 2 | China

Chengdu Tram Line, located in the capital Chengdu City of Sichuan Province, is the first tram line to be operational in the city since 2018.
train-detectionSerbia

Hungary-Serbia Railway Project | Serbia

The Hungary-Serbia Railway Project is an iconic project of the “One Belt One Road” Initiative between China and CEE countries. Frauscher provides not only high-quality solutions but also detailed technical support and clarification.
train-detectionChina

Tram Huangpu Line 1 | China

Tram Huangpu Line 1 (HP1) line is located in urban areas with high traffic density and passenger volume as well as many level crossings. The adverse weather conditions can cause flooding of the track bed and add to the challenges for reliable system availability and operations.
train-detectionUnited States of America

Class 1 Yard Project | USA

Frauscher was approached by a North American Class 1 railroad planning a major expansion of one of its yards, and the required time to completion was short. The scope of the expansion was to build an operational multitrack flat yard on vacant land within six weeks with a signalling solution to protect switches during operations.
train-detectionPoland

Metro Warsaw | Poland

Metro Warsaw was looking for an alternative to track circuits for the line M2, to increase the availability of public transport by using reliable signalling technology. In the end, the operator even decided to replace the existing track circuits on line M1 with the Frauscher Axle Counter ACS200.