Scope of project
approx. 700 wheel sensors installed

Metro Warsaw was looking for an alternative to track circuits for the line M2, to increase the availability of public transport by using reliable signalling technology. In the end, the operator even decided to replace the existing track circuits on line M1 with the Frauscher Axle Counter ACS2000.

The Warsaw Metro currently consists of two lines, with a third one planned. Urban lines are characteristically exposed to high traffic density, therefore the operator was looking for a solution which allows trouble-free operation for line M2. Keeping maintenance windows at a minimum was another requirement to the signalling technology.

To meet these expectations, the Frauscher Axle Counter ACS2000 with wheel sensor RSR180 has been implemented by Rail-Mil. The advantage of this system is the quick and efficient integration into existing signalling technology systems as it provides widely used hardware interfaces.

In combination with comprehensive diagnostic possibilities, the whole solution ensures reliable operation and cost-effective maintenance.

After years of successful implementation, Warsaw Metro decided to use the ACS2000 on further projects and even replaced existing track circuit installations on line M1. This project proves that modern axle counters are a key solution for future-oriented and sustainable rail systems.

Tried and tested technology

The highly reliable RSR180 has undergone continual development over more than 30 years. It is resistant to disturbances caused by magnetic rail brakes and can be used in grooved rails.

Easy configuration and efficient integration

The ACS2000 allows easy configuration via widely used hardware interfaces and is therefore efficiently integrated into existing signalling technology systems.

Similar Projects
This might also interest you
1/5
train-detectionUnited States of America

Charlotte Area Transit System (CATS) Supplementing Audio Frequency Track Circuits with Axle Counters

At the Charlotte Area Transit System, frequent false red signal overruns resulted when electromagnetic interference caused “bobbing” of the line’s audio frequency track circuits. The Frauscher Advanced Counter FAdC® was subsequently considered as an alternative to these track circuits to eliminate the occurrence of false red signal overruns.
train-detectionUnited States of America

Tracking Trains in Houston

Houston MetroRail (METRO for short) is comprised of three light-rail lines covering 22 miles. Two-car, low-floor trainsets are powered by overhead catenary and operated on a mix of rail types, including embedded, grooved, concrete, and ballasted track. Harsh weather conditions such as extreme heat, humidity, and storms with heavy rains causing floods are typical for Houston. Combined with the variable track structure this caused significant malfunctions of the wheel sensors of METRO’s signalling system.
train-detectionCanada

Toronto Transit Commission

The Toronto Transit Commission (TTC) Line 1 Yonge-University is Toronto’s longest subway line, with track circuits utilized for signalling. Due to an increasing number of daily passengers and an aged system the need for upgrading without interfering with the daily operations became readily apparent. It was further required that the new signalling system functions independently of the existing system. It would provide CBTC fallback functionalities, and work as an overlay to the current track circuit-based system.
train-detectionChina

Beijing Metro Line 12

The Beijing Metro Line 12 is the first metro line that combines Frauscher Advanced Counter FAdC® and Railway Signal Safety Protocol Type I (RSSP-I). The line is currently under construction and expected to be put into operation at the end of 2024.
train-detectionCanada

Edmonton Metro Line

The Edmonton Metro Line was experiencing significant issues with its newly installed Communications Based Train Control (CBTC) signalling system, which did not perform to the operator‘s expectations. The city was forced to run an incomplete schedule with reduced train speed and frequency which negatively affected commuters and the city of Edmonton in general. Finally in 2019, the operator decided to install a new system in cooperation with Frauscher.