Wherry Lines | UK
train-detectionUnited Kingdom of Great Britain and Northern Ireland

Wherry Lines

Operator
Network Rail
Country
United Kingdom of Great Britain and Northern Ireland
Partner
Atkins
Segment
Main & Regional Line
Application
Track Vacancy Detection
Products
RSR123, FAdC®
Protocols
Proprietary protocols
Year
2020

The Wherry Lines are railway branch lines in East Anglia in the East of England, linking Norwich – Great Yarmouth – Lowestoft. The project aimed to integrate Frauscher Advanced Counter FAdC® into two external systems to mitigate against a train passing a red signal without authority on approach to level crossings. Both systems were required to be a SIL 1 level and have the ability to communicate with an ElectrologIXS Interlocking.

For the Wherry Line project, two systems were implemented to mitigate against a train passing a red signal without authority on approach to level crossings. The first system being a method of predicting the likelihood of a train passing a signal based on its speed, the second being a Fast Acting SPAD Trigger (FAST) in the event that a train does traverse past a signal showing a red aspect.

The customer preferred to use the Frauscher equipment that was already installed on site for another project, consisting of the Frauscher Advanced Counter FAdC® and Wheel Sensor RSR123. This decision was made in favour of reducing lineside equipment while also reducing maintenance costs for the future.

As no data of previous speed measurement accuracy was available, Frauscher facilitated and undertook tests to determine the accuracy of the speed measurement at the speeds requested by the customer. Additionally, a formal SIL assessment was successfully undertaken by Atkins to achieve the required SIL 1 level for the system.

Lower maintenance costs

By using existing trackside equipment, no further installations were needed which reduces the required effort and costs for future maintenance.

Easy integration

The FAdC® proved its flexibility and versatility as an optimal solution for this project: It offers the ability to communicate with the customer’s protocol and can be easily integrated into existing systems.

Similar Projects
This might also interest you
1/5
train-detectionSerbia

Hungary-Serbia Railway Project

The Hungary-Serbia Railway Project is an iconic project of the “One Belt One Road” Initiative between China and CEE countries. Frauscher provides not only high-quality solutions but also detailed technical support and clarification.
train-detectionChina

CBTC Fallback System on Beijing Metro Lines

Beijing metro, one of the busiest lines in the world, was Frauscher’s very first assignment when entering the Chinese market. Due to its utilised capacity, it requires a great level of stability, reliability and performance of the entire signalling system. The Communication Based Train Control System (CBTC) applied here relies on a backup system consisting of fixed automatic train detection systems. Axle counting systems from Frauscher are perfectly suited for the accurate operation of such stand-by systems.
train-detectionKazakhstan

FAdC® at Vhodnaya Station

ArcelorMittal is responsible for the operation of a dedicated industrial railway infrastructure located in Temirtau, Kazakhstan. At Vhodnaya station, an essential shunting yard, various goods and materials, such as polyester, zinc, aluminium, sinter, iron ore, and coke-chemical products, are loaded and unloaded. The station's robust infrastructure features 64 switching points and 68 signals, necessitating the use of a high-performing train detection system to ensure the safe and efficient management of traffic flow.
train-detectionGermany

Dillinger Hütte

A new ladder track was required to provide more parking tracks in the steel plant. At the same time, the layout of the dead end tracks were optimised and the efficiency of the whole depot improved by installing the Frauscher Advanced Counter FAdC®i in combination with the wheel sensor RSR180. With the implementation of the Frauscher Diagnostic System FDS, the overall maintenance costs can be significantly reduced.
data-transmissionUnited Kingdom of Great Britain and Northern Ireland

Headbolt Lane to Rainford Project

As part of the project to expand Merseyrail services, the operator needed to address the challenge of transmitting indication information over a specific section, spanning from Headbolt Lane to Rainford. In this instance, Frauscher’s technology was utilised to fulfill the data transmission requirements of this project, avoiding expensive and time consuming cabling that would have otherwise been required.