Extension Line D Tram Bordeaux | France
train-detectionFrance

Extension Line D Tram Bordeaux

Operator
Keolis
Country
France
Partner
Vossloh-Cogifer
Segment
Urban
Application
Track Vacancy Detection
Products
RSR180, FAdC®

The Bordeaux tramway was the first French tram system equipped with a Frauscher axle counting system, benefitting from the innovative management methods like Counting Head Control.

The D line of the Bordeaux tramway is a tram line which is around 10 kilometres long. A significant challenge of D line is both the availability and reliability of the signals that allow rolling stock to move without incident.

The implementation of the Frauscher Advanced Counter FAdC® and Frauscher Wheel Sensor RSR180 support the innovative concept of Counting Head Control. The patented management method can be implemented without additional hardware and compensates counting errors which are common in urban areas.

Innovative management methods

Counting Head Control CHC is a patented concept by Frauscher which supports the availability of operations.

Patented rail claw

The Frauscher Rail Claw SK420 perfectly fits for grooved rails and has been developed especially for this field.

Similar Projects
This might also interest you
1/5
train-detection, servicesIndia

Sini - Chandil Railway Line

The Sini-Chandil railway line is a crucial rail connection located in the state of Jharkhand, which lies in the eastern coastal region of India. This railway line holds significant strategic importance for the entire region, and now incorporates Frauscher solutions, including the Frauscher Advanced Counter FAdC®, Wheel Sensor RSR180 and the Frauscher Insights applications Diagnostics and Motion.
train-detectionKazakhstan

FAdC® at Uglerudnaya Station

AcelorMittal is the operator of the Uglerudnaya industrial railway station, located in Temirtau, Kazakhstan. The station features a total of 56 switches and 52 track sections to enable the smooth flow of train traffic. To ensure the safety of all trains, an interlocking system is used to establish secure routes for incoming, outgoing, and passing trains. This requires effective traffic management and a dependable train detection system to detect the presence of trains on the tracks.
data-transmissionUnited Kingdom of Great Britain and Northern Ireland

Headbolt Lane to Rainford Project

As part of the project to expand Merseyrail services, the operator needed to address the challenge of transmitting indication information over a specific section, spanning from Headbolt Lane to Rainford. In this instance, Frauscher’s technology was utilised to fulfill the data transmission requirements of this project, avoiding expensive and time consuming cabling that would have otherwise been required.
train-detectionUnited States of America

Tracking Trains in Houston

Houston MetroRail (METRO for short) is comprised of three light-rail lines covering 22 miles. Two-car, low-floor trainsets are powered by overhead catenary and operated on a mix of rail types, including embedded, grooved, concrete, and ballasted track. Harsh weather conditions such as extreme heat, humidity, and storms with heavy rains causing floods are typical for Houston. Combined with the variable track structure this caused significant malfunctions of the wheel sensors of METRO’s signalling system.
train-detectionGermany

Dillinger Hütte

A new ladder track was required to provide more parking tracks in the steel plant. At the same time, the layout of the dead end tracks were optimised and the efficiency of the whole depot improved by installing the Frauscher Advanced Counter FAdC®i in combination with the wheel sensor RSR180. With the implementation of the Frauscher Diagnostic System FDS, the overall maintenance costs can be significantly reduced.